Practice Standard for Work Breakdown Structures ePub (Adobe DRM) download by Project Management Institute

Practice Standard for Work Breakdown Structures

Project Management Institute
Publication date: August 2013
ISBN: 9781935589464
Digital Book format: ePub (Adobe DRM)

Buy ePub

List price:
$43.99
Our price:
$38.99

You save: $5.00 (11%)
The Practice Standard for Work Breakdown Structures-Second Edition supplies project managers and team members with direction for the preliminary development and the implementation of the WBS. Consistent with A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Third Edition, the WBS Practice Standard presents a standard application of the WBS as a project management tool. Throughout the book, the reader will learn what characteristics constitute a high-quality WBS and discover the substantial benefits of using the WBS in every-day, real-life situations.
Please sign in to review this product.
Devices:
Practice Standard for Work Breakdown Structures ePub (Adobe DRM) can be read on any device that can open ePub (Adobe DRM) files.

File Size:
1423 Kb
Language:
ENG
Copy From Text:
Disabled.
Printing:
Disabled.
Practice Standard for Work Breakdown Structures ePub (Adobe DRM) download by Project Management Institute
Project Management Institute, August 2013
ISBN: 9781935589464
EAN:  9781935589464
ePub (Adobe DRM)
List Price: $43.99 eBook price: $38.99
Practice Standard for Work Breakdown Structures PDF (Adobe DRM) download by Project Management Institute
Project Management Institute, August 2013
ISBN: 9781628252675
EAN:  9781628252675
PDF (Adobe DRM)
List Price: $43.99 eBook price: $38.99
Other books by Project Management Institute
A Guide to the Project Mngement Body of Knowledge (PMBOK® Guide)-Sixth Edition (FRENCH) ePub (Adobe DRM) download by Project Management Institute
A Guide to the Project Mngement Body of Knowledge (PMBOK® Guide)-Sixth Edition (FRENCH)
Project Management Institute
Project Management Institute, December 2017
ISBN: 9781628251876
Format: ePub, PDF
List Price: $98.99 Our price: $86.99
A Guide to the Project Mngement Body of Knowledge (PMBOK® Guide)-Sixth Edition (BRZILIN PORTUGUESE) ePub (Adobe DRM) download by Project Management Institute
A Guide to the Project Mngement Body of Knowledge (PMBOK® Guide)-Sixth Edition (BRZILIN PORTUGUESE)
Project Management Institute
Project Management Institute, December 2017
ISBN: 9781628251920
Format: ePub, PDF
List Price: $98.99 Our price: $86.99
A Guide to the Project Mngement Body of Knowledge (PMBOK® Guide)-Sixth Edition (SPNISH) ePub (Adobe DRM) download by Project Management Institute
A Guide to the Project Mngement Body of Knowledge (PMBOK® Guide)-Sixth Edition (SPNISH)
Project Management Institute
Project Management Institute, December 2017
ISBN: 9781628251944
Format: ePub, PDF
List Price: $98.99 Our price: $86.99
The PMI Guide to Business Analysis PDF (Adobe DRM) download by Project Management Institute
The PMI Guide to Business Analysis
Project Management Institute
Project Management Institute, December 2017
ISBN: 9781628251982
Format: PDF, ePub
List Price: $73.99 Our price: $64.99